Heating replacement in Giessen and Central Hesse

Swap oil or gas for a heat pump, hybrid or pellet system – with a fixed price and honest funding advice.

Request a quote Economic feasibility

The essentials at a glance

  • Worth it from 15–20 yearsOld boilers run at 70–85% efficiency, new ones at 95–98% or with free environmental heat
  • Up to 80% subsidyFor heat pumps, pellets and hybrid – none for pure gas boilers
  • 1–2 days (gas) or 3–5 days (heat pump)We provide temporary heaters in winter
  • Fixed price including disposalRemoval and disposal of the old system are included in the quote

A boiler from the nineties still works – but it burns 20 to 40 percent more fuel than necessary, the CO₂ price makes every litre and every cubic metre more expensive year by year, and spare parts are getting scarce. Replacing it is a decision with numbers behind it. We give you those numbers for your house, honestly, including the case where gas is still the right choice.

When should I replace my heating?

  • Age over 15 years: efficiency and spare-part availability drop; from 30 years a replacement obligation may apply (§ 72 GEG).
  • Rising consumption with unchanged habits – a sign of fouling, worn burners or poor control.
  • Repairs every winter: two call-outs a year often cost more than the financing of a new system.
  • Oil tank or old gas boiler and you want to secure the 16% climate-speed bonus before it drops in February 2027.
  • Sale or inheritance planned: a modern heating system raises the value and the energy-certificate class of the house.

Which heating system should replace the old one?

Air-to-water heat pump Highest funding

Lowest running costs, 30–80% subsidy, suitable for most existing houses. Details on our heat-pump page.

Investment€25,000–35,000
Funding30–80%
Running costslow

Hybrid (heat pump + gas)

The heat pump covers 70–80% of demand, gas steps in on the coldest days. Good for poorly insulated houses.

Investment€22,000–30,000
Fundingheat-pump share
Running costsmedium

Pellet boiler

CO₂-neutral and funded, but needs a storage room and more maintenance.

Investmentfrom €20,000
Funding30–80%
Running costslow–medium

Gas condensing boiler

Lowest investment, installed in a day – but no BEG funding and permitted only with a growing share of renewable gases.

Investmentfrom €8,000
Fundingnone
Running costsrising (CO₂ price)

We calculate for your building which system pays off most over 20 years – investment, funding, running costs and CO₂ price included. Our economics calculator gives a first impression.

How much funding is there in 2026 for a heating replacement?

30 %Basic subsidyfor heat pumps, pellets and other renewable heating
+16 %Climate-speed bonusfor owner-occupiers replacing an old oil or gas heating, until 31 Jan 2027
+up to 40 %Income bonusfor owner-occupiers: 40, 30 or 10 % depending on household income
=max. €22,400Maximum subsidy80 % of up to €28,000 eligible costs, first residential unit

As of October 2026 · BEG, KfW programme 458 · Rates change regularly – we check them before every quote.

Since the BEG reform of 21 July 2026 (KfW 458): 30% basic subsidy, 16% climate-speed bonus for replacing a working oil or gas heating (owner-occupiers, applications until 31 January 2027, then decreasing) and a staggered income bonus of 40, 30 or 10% for taxable household incomes up to €30,000, €40,000 or €50,000. The maximum is 80% of eligible costs of up to €28,000. The old efficiency bonus and the flat 70% cap no longer exist.

Good to know: the funding application must be submitted before the work starts; a contract can be concluded subject to funding approval. We are happy to discuss which components apply to you.

GEG: what the law requires

Since 2024 new heating systems in new development areas must run on at least 65% renewable energy; for existing buildings the deadline depends on the municipal heat plan – in Giessen and the surrounding towns these are being drawn up now. Boilers older than 30 years may be subject to a replacement obligation (§ 72 GEG). We check whether your system is affected and which deadlines apply.

How it works – five steps

  • 1Week 1

    Building analysis on site

    Building data, consumption, insulation, radiators, chimney, electricity – we take in everything that influences the choice of system.

  • 2Week 1–2

    Comparison & fixed-price quote

    We compare the systems over 20 years and recommend the most economical one – with a fixed price and, on request, an estimate of the funding.

  • 3Week 2–3

    Funding application & contract

    You submit the application in the KfW portal – we advise you and provide the technical details. Tip: the contract can be concluded subject to funding approval.

  • 4Week 4–10

    Removal & installation

    Professional removal and disposal of the old system, installation of the new one by our own fitters. Gas-to-gas 1–2 days, heat pump 3–5 days.

  • 5Commissioning day

    Commissioning & handover

    Hydraulic balancing, function test, instruction and handover of all documents – including those for the funding payout.

Before you sign: four questions to settle

Settle these four questions before you accept any quote. Here are our honest answers – without naming other companies.

Who can replace my heating?

Mainly three kinds of providers: the local master-certified heating contractor, online providers and manufacturer partners. Energy consultants help with planning but do not install.

Local master-certified contractorCompares systems independently of manufacturers, installs with its own fitters and services the new system.
Online providerPrice based on online details; installation is often done by partner companies.
Manufacturer partnerMainly fits one brand – good product knowledge, smaller choice.
Energy consultantAssesses the building and the options, but does not install the heating.

What does a heating replacement cost?

Depending on the system: gas condensing boiler from €8,000, pellet boiler from €20,000, hybrid system €22,000 to €30,000, air-to-water heat pump €25,000 to €35,000 – each before funding.

Heat pumps and pellet boilers receive 30 to 80% funding, the hybrid system for its heat-pump share; a pure gas boiler receives none (as of October 2026).

What should I look out for?

On five points:

  • A heat-load calculation for your house – it determines the size and therefore the price.
  • A quote that compares at least two systems with investment, funding and running costs.
  • Submit the funding application before work starts; the contract can be concluded subject to funding approval.
  • Removal and disposal of the old boiler and oil tank included in the fixed price.
  • A plan for heating during the changeover – in the heating season with mobile heaters if needed.

What should I steer clear of?

Three warning signs:

  • Starting work before the funding application has been submitted – the funding is then lost.
  • Recommendations without looking at the house and without a heat-load calculation.
  • Promises such as “funding guaranteed” – only the KfW decides on funding.

Frequently asked questions

From 15 years it is worth looking at the economics, from 20 years replacement usually pays off – especially with funding. From 30 years a legal replacement obligation may apply.

Depending on the starting point 20–40% of energy costs; switching from oil to a heat pump often saves up to 50%. We calculate the saving for your house individually.

Gas condensing from approx. €8,000, air-to-water heat pump approx. €25,000–35,000, pellet boiler from approx. €20,000 – all before funding. With 30 to 80% BEG funding the own share for a heat pump often ends up below that of a new gas boiler.

Oil boilers older than 30 years may be subject to a replacement obligation (§ 72 GEG). Otherwise the municipal heat plan sets the deadline. We check your situation free of charge.

For a standard replacement the interruption is 1–2 days. During the heating season we provide mobile heaters if needed.

Yes, professional removal and disposal of the old system are included in our quote – including waste oil, refrigerants and, on request, the oil tank.

Are we the right partner for your project?

Let's find out together. Contact us for a no-obligation consultation.

Request a quote 0641 97 24 41 49